Snagging services
Independent snagging inspections across Munster and Connacht. Every inspection ends with the same thing: a written, photographed snag list you can act on. Prices are quoted per property, so get in touch for a quote.
Houses & Apartments
A full snag list inspection of a newly built home before you close the sale. Every room, the attic and the outside of the property are checked, and every defect is photographed and listed for the builder.
- Full room-by-room inspection
- Photograph of every snag
- Written snag list for the builder
Extension Snagging
Extensions are usually paid for in stages, with the balance due on completion. An inspection before that final payment records any defects or unfinished work while the builder is still obliged to put them right.
- Finishes, fittings and joinery checked
- Windows, doors and roofs inspected
- Written list for the builder
Rental Properties
A snag and condition report for a rental property at handover, recording defects and the general condition room by room before tenants move in, so there is a clear record to refer back to.
- Room-by-room condition record
- Photographs throughout
- Defects listed separately
The snag list itself
Every inspection produces a written snag list in this format, with a photograph of each item and its exact location in the property, ready to hand to the builder.
| Ref | Room | Snag found |
|---|---|---|
| 1 | Kitchen | Paint splashes on unit doors and hinges; two cupboard doors misaligned |
| 2 | Main bathroom | Sealant missing around the bath; gaps in the grout at the shower corner |
| 3 | Bedroom 2 | Window opener stiff; trickle vent painted shut |
| 4 | Hall | Front door catching on the frame; letterbox flap loose |
| 5 | Living room | Hairline crack across the ceiling plaster; one socket dead on the party wall |
| 6 | Outside | Rear gully blocked with mortar; front path paving slab rocking |
What to do when the list comes back
Send the list to the builder
Pass the full snag list, with the photographs, to the builder or developer. It is written to be worked from: every item has a location and a photo.
Agree a timeframe
Agree when the repairs will be done. Ideally the bulk of the list is cleared before you close; anything outstanding should be agreed in writing with a date.
Check the repairs
When the builder says the list is cleared, a re-inspection walks the property against the original snag list and confirms what has been fixed and what has not.
Get your new home snagged before you close
Tell us the property type, where it is and when you are due to close, and we will come back with a quote.